I-75 Widening from North of SR 80 to South of SR 78

Contract Type: Design-Build-Finance

Contract Amount: $72 million

Location: Lee County, Florida

Client: FDOT District One

JV Partner: Leware Construction Company, Inc.

Design Partners: Stantec (Prime), HDR

2016

TBA/FDOT Best in Construction (Major Bridge)

2016

FICE Outstanding Bridge Project

2015

#3 Bridge in North America (Roads & Bridges Magazine Top 10 Bridges)

2015

National ABC Project Award (Prefabricated Bridge Elements and Systems)

Project Gears Eye Candy
The project will provide two (2) additional lanes in each direction of I-75 within the existing median for a distance of approximately 1.6 miles between the SR 80 interchange and the SR 78 interchange in Lee County, Florida. The project includes the widening of four (4) pairs of bridges and is surrounded by environmentally sensitive wetlands, navigable waterways, creeks and marsh.
At the heart of the project is the widening of the 3,900 foot I-75 over Caloosahatchee River Bridges.
These bridges are high-level fixed structures over a major navigable waterway and require heavy
construction activities within an environmentally sensitive area, including protection of manatees
and small tooth sawfish habitat. Use of special top-down construction methods are required as
well as close coordination with various regulatory agencies regarding impacts to wetlands and
threatened species. Construction is on-going.